So here are the photos from the last two (or it could be three, although I'm pretty sure its two) weeks.
You can see the rooms taking shape, but only if you've seen the plan. This is the en suite bathroom through the wall from the nursery. |
Where the en suite bathroom joins the old roof. |
The wall insulation has arrived. |
The replacement tiles arrived. They are red so now we have a patch work. We'll have to add repainting to the roof to our going-over-budget list. |
The roof is still not complete but we discovered yesterday that they cannot officially complete and seal the roof until the engineer has signed off on the structure. |
The empty space in the floor is for the staircase. |
The 'noggins' which make the floor super stable. |
The frames for the window are going in. These however are the wrong size...hmmm. |
Frame for window in CG's bedroom. |