Wednesday, May 2, 2012

Photo Diary - Mid April

Finally the engineer came and gave the green light for the structure and now the construction to continue. Here you can see the metal speed bracing which we were waiting for. Now the structure can be closed or sealed.

Electrics are in and what a pain that was - loads of issues, things in wrong places and wired incorrectly.

Now that the engineer has given the green light the floors can go in. Yay.

Our bedroom wall which has given lots of headaches due to incorrect windows, window and door sizes being delivered. Finally the correct door and one window are in. The other window is still on its way because they delivered two right opening windows. How silly who wants the windows on either side of the door to open the same way - surely I am not crazy to think that it makes sense for the two windows to open in opposite directions.