So here are the photos from the last two (or it could be three, although I'm pretty sure its two) weeks.
![]() |
You can see the rooms taking shape, but only if you've seen the plan. This is the en suite bathroom through the wall from the nursery. |
![]() |
Where the en suite bathroom joins the old roof. |
![]() |
The wall insulation has arrived. |
![]() |
The replacement tiles arrived. They are red so now we have a patch work. We'll have to add repainting to the roof to our going-over-budget list. |
![]() |
The roof is still not complete but we discovered yesterday that they cannot officially complete and seal the roof until the engineer has signed off on the structure. |
![]() |
The empty space in the floor is for the staircase. |
![]() |
The 'noggins' which make the floor super stable. |
The frames for the window are going in. These however are the wrong size...hmmm. |
![]() |
Frame for window in CG's bedroom. |
No comments: